29 March 2010

Interim Review: 26th March 10

Project Memory

Project Development




General Feedback:
- more rigourous plans - stacked servicing spaces, vertical circulation
- too many entrances
- servicing lane might not be successful
- rectangular studios than square
- need more structural concern

Recommendations:
- Start modelling
- Consider structure based on historical examples
- Refinement on spaces
- Styling of building based on research

18 March 2010

Model Making - Week 6

Model making has never been my strong point but an architecture student has to do what he has to do (or asked to do). Completed in total 12 hours including hours of figuring out the drawings which was a nightmare.

Building: Palais de Dance
Built: 1922
Demolished:1970s. Replaced by The Plaza.
Site: Intersection between Eglinton, Victoria, and Pollokshaws St.
Scale: 1:100

just love the ancient manual drawings.*

brilliantly drafted sections.*

8 hours into construction. Section model.


Completion.

* drawings from Mitchell Library Archive Department.

12 March 2010

re : surface

Dance House is currently launching its Scottish-China Dancelinks programme. If you're into dance performance and not too caught up with projects this week, it's well worth a try. These guys are real passionate bunch! Details as below:


JUMPING FRAMES - HONG KONG DANCE COLLECTION British Premiere
Wednesday 17 March 19.00 @ CCA, 350 Sauchiehall Street £5 (£3) Box Office: 0141 352 4900


"...featuring the hottest dance artists, as well as hilarious commentary on Hong Kong style tea canteen, fashion chic and other "hongkee" indulgence.This collection of eight works highlights the best of original talent in digital technology, video art and choreography currently working in Hong Kong."